Dodd Modular was contracted to design and build a bespoke handling system for delivering wall frames to the box build area for a new US client – Modern Living Solutions.
The project included the development and design of the feed system and subsequent box build system.
Dodd were contracted to provide the design, 3D modelling and ‘first in class’ product development. This included prototype build and test of the system, followed by the build and commissioning of the developed system.
The project required a new and innovative design of system both mechanically and electronically capable of moving the wall frames consistently and most importantly around 90 and 180 degrees. This issue had not been solved by US suppliers which was the reason the client approached Dodd Modular.
The resolution of these technological uncertainties was not readily deducible. Through detailed design reviews and numerous revisions, followed by significant prototype development throughout the commissioning processes.